Sept . 2017~Feb.2018
Total around 2800CBM / 960TON Paper&Pulp machinery, including 4 units @ 16.3m * 4.75m * 4.65m / 60ton from Zhongshan,South China to Manzhouli BY and trucks and multimodal through Bayuquan terminal (Yingkou), where reloading was arranged for further transport to jobsite Ust-Ilimsk.